This is how we build our houses

Here you will find our Building Specifications explaining how our houses are built, including full details of our high quality standards.
For better understanding, we have used the plans for our villa model “Palmera”. All models shown in this catalogue
are proposals of how your villa can be built, which aims to give you initial ideas, 

Read more …

Building Specifications

1. Projekt

First of all, individual plans will be set up, taking into account the clients’ individual wishes. After that, all static
plans necessary to apply for the building permission will be set up, which form the base for the final realization and
includes the following...

Read more …

2. Care and supervision during the building

Die Baubetreuung während der Bauphase beinhaltet die Auswahl der Ausstattungsdetails entsprechend den Wünschen des Bauherren sowie die Besprechung und Ausarbeitung von Zusatzwünschen des Bauherren. Der gesamte...

Read more …

3. Setting out and start of work

Es erfolgt die erforderliche Säuberung des Grundstückes. Hierbei versuchen wir, bestehende Bäume und Sträucher, soweit diese den Bauablauf nicht beeinträchtigen, zu erhalten. Der zu errichtende...

Read more …

4. Up to roof stage

4.1. Fundamente

Es erfolgt der Aushub von Fundamentgräben in den erforderlichen Dimensionen. Falls es sich um einen geneigten Baugrund handelt, werden die Streifenfundamente als Treppenfundamente ausgeführt, so dass das Fundament...

Read more …

5. Interior finishing

5.1. Electrical Installation

Wiring will be carried in flexible plastic conduits built-in to the walls....

Read more …

6. Finishes

The house will be handed over in a perfectly clean state, all waste, rubble, rubbish etc. removed, all glass, objects, floors etc...

Read more …

7. Others

7.1. Surrounding path

A reinforced concrete path will be laid around the perimeter of the house, where there is natural ground level and no terracing...

Read more …

8. Exclusions

The standard contract of construction, based on the present Specifications, do not include the following items:

Electrical appliances (other than those mentioned)...

 

Read more …